The Changshan Road project, classified as one of the 26 key projects of Liyang Transportation Bureau in 2016, officially started construction in the end of May. Changshan Road is a link connecting the West Liyang Exit of Changchun-Shenzhen Expressway and the Provincial Highway 360, with a total length of 9.152 km. The project includes the Liyang Urban Section of State Highway 104 with a total length of 0.835 km and the roadbed width of 33.5 m, designed with six two-way lanes and a speed limit of 100 km / h. The rest section is constructed according to the secondary standard, with the roadbed width of 30 m, designed with four two-way lanes and a speed limit of 80 km / h. The project has a total investment of 310 million yuan, scheduled to be completed within the year. After the completion, the Changshan road will become an important access to high-speed transportation, which will contribute to the development of local industrial parks and tourist resorts.
扫一扫在手机打开当前顴/p>
|